Insudtries we Serve

Highway

  1. Home
  2. »
  3. Highway

Highway

Development of Bundelkhand 6 Lane Expressway Project Pkg-1

Development of Bundelkhand 6 Lane Expressway Project Pkg-2

Development of Bundelkhand 6 Lane Expressway Project Pkg-3

Development of Gorakhpur 6 Lane Expressway Project Pkg-1

Development of Gorakhpur 6 Lane Expressway Project Pkg-2

Six Lane Akshardham to UP Border package 1

Six Lane UP Border to EPE Junction package 2

Pre-Bid Services for Construction of Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH71 and connecting link from Km 347.800 of NH71 to Km 9.400 of NH71A (balance work) on EPC Mode

2 Laning of Hukanjuri to khonsa section of NH-315A from KM 0.00 to KM 9.00 (Package-A) Arunachal Pradesh

NH17-Neeleshwaram to Thaliprambha package 3

NH17-Thaliprambha to Muzhapilangad package 4

Raipur- Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode. [Package- 1 (AP)]

Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode [Package – 2(AP)]

Delhi Amritsar Katra Expressway on HAM mode in the state of Punjab and UT of J&K (Phase ll-Package XIV,XV & XVI)

Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode.

4 Lanning of Ujjain-Badnawar Section from km 29.6 to km 96.00 ( Length-69.1km) in the State of Madhya Pradesh on HAM.

Development to 4/6 Lanning of NH-31 ( New NH-10) with both sides service roads from km 569.258 to km 581.030 ( End of AH-02 on NH-31 near Shivmandir to Sevoke Army Cantonment) in the districts of Darjeeling and Jalpaiguri, West Bengal on EPC Mode (job No.010/WB/2021-22/490).

Widening & Upgradation to four lane configuration from km 34.900 (Bhadohi) to km 54.150 and km 58.800 to km 70.400 (Jaunpur bypass section) and to two lane with paved shoulder from km 54.150 to km 58.800 & Km 70.400 (Jaunpur Bypass section) to Km 73.134 (Jaunpur) of NH-135A in the state of Uttar Pradesh on EPC mode.

Ghazipur – Mau Road (NH-24) at Mardah town and passes through Jalalabad, Jakhania, Sadat and ends at Saidpur bypass of NH-31 on Saidpur – Sadat Road). The existing length of project road is 55.610 km

Ghazipur – Mau Road (NH-24) at Mardah town and passes through Jalalabad, Jakhania, Sadat and ends at Saidpur bypass of NH-31 on Saidpur – Sadat Road). The existing length of project road is 55.610 km

Four laning from Godibandha to Ballahar Chhak, Ballhar Chhak to Banarapal & Banarapal to Start of Anugul by-pass at Km.314.130 to Km.321.035 of NH-53, at Km.75.200 to Km.84.000 of NH-149 & at Km.84.000 to Km.86.100 of NH-55 on HAM in the state of Odisha.

Construction of 4/6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part-1 north of NH-27, from Km 0+000 to Km 30+400 (Starting near exst. km 112+540, ending at exst. km 139+928 of NH – 27) and Part-2 south of NH-27 from Km 0+000 to Km 5+000 on HAM basis under NHDP Phase-VII in the State of Uttar Pradesh

Construction of 4/6 lane Southern Ayodhya Bypass from Km 5.000 to Km 37.172 ( starting near km 112.54, ending at Km. 153.281 of NH -27) of total length NHDP Phase- VII in the state of Utter Pradesh

Four Lane Elevated Corridor and at-grade improvements from Design Ch:0+000 to Design Ch: 19+870 of Danapur – Bihta Section with providing connectivity to the existing RoB near Danapur station (0.231 km), 1.35 Km ramps & at-grade improvements to Four lane section on Danapur side and Upgradation of existing Two lane carriageway to Four Lane carriageway from Design Ch:19+870 to Design Ch:23+500 of Bihta - Koilwar section (Total Length 25.081 Kms) in the state of Bihar on EPC Mode

Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to  Maduravoyal  in  Chennai  District  from  km  -0+342  to  Km  20+223  under  Bharatmala  Pariyojana in the State of Tamil Nadu- Package-III (km 9+700 to Km 14+185)  on EPC  mode  

Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km -0+342 to Km 20+223 under Bharatmala Pariyojana in the State of Tamil Nadu- Package-II (km 4+604 to Km 9+700) on EPC mode.

4-6 laning of Marutharoad to Karimba section of NH-966 from km. 0.000 to km. 30.720 (Design Length 30.559) in the State of Kerala on Hybrid Annuity Mode under BMP

4 or 6 laning of Karakkunnu to Vazahayoor section of NH 966 from km. 87.930 to km. 113.000 in the State of Kerala on Hybrid Annuity mode under Bharatmala

Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Oorugonda village in Hanamkonda District at Design Ch. 112.240 Km to Venkatapur village in Warangal District at Design Ch. 150.240 Km (total length 38.000 Km) under other Economic Corridor (NH(O)) programmes on Hybrid Annuity Mode in the State of Telangana (Package-I).

Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G (Warangal-Khammam) from Venkatapur village in Warangal District at Design Ch. 150.240 Km to Thallasenkesa village in Mahabubabad District at Design Ch. 189.650 km (total length 39.410 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-II)

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66) in the State of Kerala in HAM mode under Bharatmala Pariyojana

4/6 laning of Edathanattukara to Karakkunnu section of NH-966 from km. 61+440 to km. 87+930 (Package 3) in the State of Kerala on Hybrid Annuity Mode

4/6 laning of Karimba to Edathanattukara section of NH-966 from km.30.720 to km.61.440 in the State of Kerala in HAM mode under Bharatmala Pariyojana.

4 or 6 laning of Vazahayoor to Iringaullur section of NH-966 from Km 113.000 to Km 121.006 in the state of Kerala in HAM mode under Bharatmala

  1. Development of Bundelkhand 6 Lane Expressway Project Pkg-1
  2. Development of Bundelkhand 6 Lane Expressway Project Pkg-2
  3. Development of Bundelkhand 6 Lane Expressway Project Pkg-3
  4. Development of Gorakhpur 6 Lane Expressway Project Pkg-1
  5. Development of Gorakhpur 6 Lane Expressway Project Pkg-2
  6. Six Lane Akshardham to UP Border package 1
  7. Six Lane UP Border to EPE Junction package 2
  8. Pre-Bid Services for Construction of Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH71 and connecting link from Km 347.800 of NH71 to Km 9.400 of NH71A (balance work) on EPC Mode
  9. 2 Laning of Hukanjuri to khonsa section of NH-315A from KM 0.00 to KM 9.00 (Package-A) Arunachal Pradesh
  10. NH17-Neeleshwaram to Thaliprambha package 3
  11. NH17-Thaliprambha to Muzhapilangad package 4
  12.  Raipur- Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode. [Package- 1 (AP)]
  13. Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode [Package – 2(AP)]
  14. Delhi Amritsar Katra Expressway on HAM mode in the state of Punjab and UT of J&K (Phase ll-Package XIV,XV & XVI)
  15. Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode.

We are the best

“You can design and create, and build the most wonderful place in the world. But it takes people to make the dream a reality.” - Walt Disney

Get In Touch With US

=