Insudtries we Serve

Metro And High Speed Train

Contract DC-03:

Contract DC-03: Part Design and  Construction of  Elevated  Viaduct, Elevated  Ramp,  Siding  lines, Viaduct  for  connection  to  Mukundpur Depot and four Elevated Stations Bhalswa, Majlis Park, Azadpur and  Ashok Vihar {Excluding Architectural Finishing works, steel FOB (except  at  Ashok  Vihar  station  which  is  including)  &  PEB  works  of stations}  from  Chainage  15206.166  m  to  22680.000  m  of  Janakpuri West to R.K. Ashram Corridor (Extn. Of Line-8) of Phase-IV of Delhi MRTS  and  partly  integrated  and  partly  independent  flyover  of  PWD between Azadpur and Derawal Nagar on G.T. Road.

Contract DC-02

Contract DC-02:  Part  Design  and  Construction  of  Elevated    Viaduct  from  Maujpur  (excluding)  to  Majlis  Park  (excluding)  including  Bridge  across river Yamuna, Integrated Elevated Viaduct with PWD flyover at  lower  deck  &  metro  line  at  upper  deck  from  Yamuna  Vihar  to  Bhajanpura and 08 Elevated Stations viz.  Yamuna Vihar, Bhajanpura,  Khajuri Khas, Sonia Vihar, Soorghat, Jagatpur Village, Jharoda Majraa  and Burari (including Entry & Exit structures at stations but excluding  Architectural  finishing,  Pre-engineered  steel  roof  structure  and  roof  sheeting  of  stations)  from  Chainage  0  M  to  12098.520  M  of    Majlis  Park – Maujpur Corridor of Delhi MRTS Phase-IV project 

 

Contract DC-04

Contract DC-04: Part Design and Construction of Integrated structure consisting of Elevated Viaduct and 6 lane flyover (Double Deck system), Viaduct and Elevated Ramps for viaduct  and  flyover,  Siding  lines,  Under  Pass  at  saket  G,  Elevated  Ramp  from  BRT  corridor  to  flyover and two lane underpass from MB road to BRT corridor and Four Elevated Stations    Sangam  Vihar,  Khanpur,  Ambedkar  Nagar  and  Saket  G  (Excluding  Architectural  Finishing  works  of  stations  and  PEB  works  of  stations)  from  Chainage  14480.00  m  to  18760.00 m of Aero City  to Tuglakabad Corridor of Phase-IV of Delhi MRTS 

Contract NGNC-01

Contract NGNC-01: Part Design and Construction of Elevated Viaduct and 5 elevated stations viz NOIDA SEC -122, NOIDA SEC-123, GR. NOIDA SEC-4, ECOTECH-12, GR. NOIDA SEC-2, (excluding Architectural finishing  Works and PEB works of stations) from Chainage 0.00 m to Chainage 9605 m of Noida -Greater Noida Metro  Rail Project 

Contract Pc-01

Contract Pc-01 : Part Design and Construction of Elevated Viaduct, Viaduct connection to Depot including elevated ramp  for  Depot, Stabling &  Extension of  Viaduct for Corridor-1  at  Khemni Chak Station,Special Spans, Elevated Ramp at Malai  Pakri  and  Five  Elevated  Stations    Malai  Pakri,  Khemni  Chak  (Interchange  station),  Bhoothnath,  Zero  Mile  &  New  ISBT  (Excluding  Architectural  Finishing  works  of  stations  &  PEB  works  of  stations)  from  Chainage  8020.000  mt.  to  14127.726 mt. of Patna Railway station to New ISBT Corridor- 2 of Phase-I of Patna MRTS. 

Contract Pc-04

Contract Pc-04:  Part  Design  and  Construction  of  Elevated  Viaduct,  elevated  ramp  at  Mithapur  &  Patliputra  and  seven  stations  viz  Danapur,  Saguna  More,  RPS  More,  Patliputra,  Mithapur,  Ramkrishna  Nagar  &  Jaganpura  Station  (Excluding  Architectural  Finishing  &  PEB  works) in Corridor-1 of Phase-I of Patna MRTS. 

  •  

Package No. MAHSR C 7

(Package No. MAHSR C 7) Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Ahmedabad Station, Sabarmati Station, Viaduct & Bridges, Crossing Bridges (excluding fabrication and transportation of steel truss girders) and Associated works between MAHSR Km. 489.467 and MAHSR Km. 507.599 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail

  •  

Package No. MAHSR C 5

(Package No. MAHSR C 5) Design and Construction of Civil and Buildings Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Vadodara Station, Confirmation Car Base, Viaducts & Bridges, Crossing Bridges and Associated works between MAHSR Km. 393.700 and MAHSR Km. 401.898 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail

  •  

Package No. MAHSR C 5

(Package No. MAHSR C 5) Design and Construction including Maintenance of Civil and Building Works for Sabarmati Depot on Design Build Lump Sum Price Basis for High Speed Railway involving works for Ground Preparation, relating Roads, Piping, Wiring, Landscaping, General Inspection Train Shed, Maintenance Car Shed, Safety Confirmation Car Shed, Staff Room and other Associated works between MAHSR Km. 507.599 and MAHSR Km. 509.726 in the State of Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail

  •  

We are the best

“You can design and create, and build the most wonderful place in the world. But it takes people to make the dream a reality.” - Walt Disney

Get In Touch With US

=